Electrical High-Load Fire Risk Assessment

Built for Electrical High-Load

Data • server rooms • UPS risk

Electrical High-Load premises carry sector-specific fire risks that a generic assessment will miss. Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person must arrange a suitable and sufficient fire risk assessment covering ignition sources, escape routes, detection and the people who use the building. HawkSwift's NEBOSH-qualified assessors produce court-defensible reports tailored to electrical high-load — from £849 (instant quote confirmed in the form).

Book Your Electrical High-Load AssessmentCall us on 07718 611 667
Scope of Review

What We Check for Electrical High-Load

Every assessment is tailored to the real risks of your sector.

01Has a periodic electrical installation condition report (EICR) been carried out within the required interval (maximum 5 years for commercial premises)
02Are all high-load electrical circuits (server rooms, commercial kitchens, industrial plant) protected by RCDs and correctly rated fuses or MCBs
03Has thermographic (thermal imaging) inspection of switchgear, distribution boards and high-load cable runs been carried out in the last 3 years
04Are electrical distribution boards accessible, clearly labelled, and free from combustible storage in front of or around them
05Are cable management systems (trays, trunking, conduit) adequate for the load carried and maintained to prevent overheating
06Is portable electrical equipment (extension leads, portable appliances) subject to formal PAT testing and visual inspection programmes
Investment

Electrical High-Load Assessment Pricing

From £849 · fixed price, no hidden fees

Micro Assessment
Tailored to electrical high-load
Fast Track Assessment
Tailored to electrical high-load
Standard Assessment
Tailored to electrical high-load
From £849
Enhanced Assessment
Tailored to electrical high-load
Enhanced Plus Assessment
Tailored to electrical high-load
Enhanced Large Assessment
Tailored to electrical high-load
Enhanced Premium Assessment
Tailored to electrical high-load

Exact price confirmed instantly in the quote form based on size, occupancy and complexity.

The Process

How It Works for Electrical High-Load

01

Book Online

Tell us about your electrical high-load premises and pick a date that suits you — same-week appointments available.

02

Assessor Visits

A NEBOSH-qualified assessor inspects your electrical high-load premises against the specific risks for your sector.

03

Report in 48hrs

Your tailored, RRO 2005 compliant report is delivered within 48 hours — ready for inspectors, your Fire Authority and insurers.

Assurance

Why Hawkswift

RRO 2005 Compliant
NEBOSH Qualified
Fully Insured
Same-Week Available
Questions

Electrical High-Load — Frequently Asked Questions

Yes. Any non-domestic electrical high-load premises requires a suitable and sufficient RRO 2005 assessment. For electrical high-load this must specifically address has a periodic electrical installation condition report (eicr) been carried out within the required interval (maximum 5 years for commercial premises), protected escape routes and staff fire-action duties.

Get Started

Ready to Book Your Electrical High-Load Assessment?

Get a tailored, compliant fire risk assessment written for electrical high-load premises — from £849.

Book Your Electrical High-Load Assessment

Browse all sector-specific assessments